Complete house renovation — Timo
What was done
- Replaced the windows and renewed the services
- Installed underfloor heating
- Fitted a fireplace
- Tiled floors and laminated parquet
- Sanded and varnished the parquet
- Fitted electric roller shutters
- Carried out the electrical installation
- Clad the fireplace surround in natural stone
- Fitted the awning with a wind sensor
- Interior plastering and painting
- Insulated the exterior walls and applied decorative render, on the house and the garden walls
- Repaired the masonry where the old render had broken down
- Mechanised skimming and super-washable paints inside
Materials and equipment
A complete external thermal insulation system, finished with decorative silicone render chosen for its resistance to severe weather. Inside, fine renders, mechanised skimming and super-washable paints.
Result
A ten-month renovation that turned the building into an energy-efficient, modern and premium-looking home.