Not a gallery of pretty pictures: each project below shows the stages of the work and explains the operations, the difficult part, the materials and the result.

Complete renovation

Complete house renovation — Timo

Germany · 2012 – 2015 · 32 photographs

Complete house renovation — Timo — 11 Mai 2015
11 Mai 2015
Complete house renovation — Timo — 29 Juli 2015
29 Juli 2015
Complete house renovation — Timo — 31 Juli 2015
31 Juli 2015 · Fireplace
Complete house renovation — Timo — 10 August 2015
10 August 2015 · Heating installation
Complete house renovation — Timo — 13 August 2015
13 August 2015
Complete house renovation — Timo — 13 August 2015
13 August 2015 · Heating installation
Complete house renovation — Timo — 19 August 2015
19 August 2015 · Parquet sanded and varnished
Complete house renovation — Timo — 31 August 2015
31 August 2015
Complete house renovation — Timo — 31 August 2015
31 August 2015 · Fireplace
Complete house renovation — Timo — 3 September 2015
3 September 2015
Complete house renovation — Timo — 3 September 2015
3 September 2015 · Floor tiling
Complete house renovation — Timo — 3 September 2015
3 September 2015 · Floor tiling
Complete house renovation — Timo — 8 September 2015
8 September 2015 · Natural stone cladding
Complete house renovation — Timo — 15 September 2015
15 September 2015 · Insulation
Complete house renovation — Timo — 16 September 2015
16 September 2015 · Insulation
Complete house renovation — Timo
Insulation and mesh reinforcement
Complete house renovation — Timo — 18 September 2015
18 September 2015
Complete house renovation — Timo — 18 September 2015
18 September 2015 · Exterior painting
Complete house renovation — Timo — 24 September 2015
24 September 2015
Complete house renovation — Timo — 1 Oktober 2015
1 Oktober 2015
Complete house renovation — Timo
Exterior paint finishing
Complete house renovation — Timo — 9 Oktober 2015
9 Oktober 2015
Complete house renovation — Timo — 30 Oktober 2015
30 Oktober 2015
Complete house renovation — Timo — 5 November 2015
5 November 2015
Complete house renovation — Timo — 5 November 2015
5 November 2015 · Awning with wind sensor
Complete house renovation — Timo
Insulating paint on the plinth
Complete house renovation — Timo
Facade repainted
Complete house renovation — Timo
Electrical installation
Complete house renovation — Timo — 11 November 2015
11 November 2015
Complete house renovation — Timo — 11 November 2015
11 November 2015 · Roller shutters
Complete house renovation — Timo — 11 November 2015
11 November 2015 · Roller shutters
Complete house renovation — Timo — 11 November 2015
11 November 2015 · Roller shutters

What was done

  • Replaced the windows and renewed the services
  • Installed underfloor heating
  • Fitted a fireplace
  • Tiled floors and laminated parquet
  • Sanded and varnished the parquet
  • Fitted electric roller shutters
  • Carried out the electrical installation
  • Clad the fireplace surround in natural stone
  • Fitted the awning with a wind sensor
  • Interior plastering and painting
  • Insulated the exterior walls and applied decorative render, on the house and the garden walls
  • Repaired the masonry where the old render had broken down
  • Mechanised skimming and super-washable paints inside

Materials and equipment

A complete external thermal insulation system, finished with decorative silicone render chosen for its resistance to severe weather. Inside, fine renders, mechanised skimming and super-washable paints.

Result

A ten-month renovation that turned the building into an energy-efficient, modern and premium-looking home.

Terrace, waterproofing and installations

Terrace, insulation and services — Asturias

Güexes, Parres, Asturias — Spain · January – February 2026 · 16 photographs

What was done

  • Built a terrace and covered it with tiles
  • Insulated the lateral enclosures where water was infiltrating
  • Carried out part of the sanitary and heating installation
Technical drying

Drying works — Suter

Switzerland · November 2023 – June 2024 · 9 photographs

Drying works — Suter — 9 November 2023
9 November 2023
Drying works — Suter — 9 November 2023
9 November 2023
Drying works — Suter — 9 November 2023
9 November 2023
Drying works — Suter — 12 Juni 2024
12 Juni 2024
Drying works — Suter — 12 Juni 2024
12 Juni 2024
Drying works — Suter — 12 Juni 2024
12 Juni 2024
Drying works — Suter — 12 Juni 2024
12 Juni 2024
Drying works — Suter — 12 Juni 2024
12 Juni 2024
Drying works — Suter — 12 Juni 2024
12 Juni 2024

What was done

  • Installed professional drying equipment and monitored the drying progress
  • Ran suction hoses into the walls to draw the moisture out of the structure
  • Sealed the work areas with protective sheeting
  • Protected the floors and finishes along the way
  • Refitted the wall-mounted equipment and cleaned up at the end

The difficult part

Positioning the equipment precisely in a very narrow bathroom, sealing the area with sheeting, and running the hoses in behind the finishes without destroying the plasterboard or the tiles.

Materials and equipment

Professional dehumidifiers and dryers, suction hoses, protective sheeting and masking tape.

Result

The structure dried back to a safe moisture level and the space returned to use.

Complete renovation

House renovation — Casa Urs

Switzerland · January – February 2019 · 13 photographs

House renovation — Casa Urs — 19 Januar 2019
19 Januar 2019
House renovation — Casa Urs — 21 Januar 2019
21 Januar 2019
House renovation — Casa Urs — 21 Januar 2019
21 Januar 2019
House renovation — Casa Urs — 23 Januar 2019
23 Januar 2019
House renovation — Casa Urs — 23 Januar 2019
23 Januar 2019
House renovation — Casa Urs — 23 Januar 2019
23 Januar 2019
House renovation — Casa Urs — 23 Januar 2019
23 Januar 2019
House renovation — Casa Urs — 24 Januar 2019
24 Januar 2019
House renovation — Casa Urs — 24 Januar 2019
24 Januar 2019
House renovation — Casa Urs — 24 Januar 2019
24 Januar 2019
House renovation — Casa Urs — 24 Januar 2019
24 Januar 2019
House renovation — Casa Urs — 25 Januar 2019
25 Januar 2019
House renovation — Casa Urs — 1 Februar 2019
1 Februar 2019

What was done

  • Replaced the windows and glazing and fitted new window sills
  • Installed an alarm system
  • Laid laminated parquet and repainted the interior
  • Ran additional electrical points: sockets, switches and new lighting
  • Fitted the kitchen furniture and fully refitted the bathroom, tiling included
  • Renewed the sanitary installation for the new fittings

The difficult part

Running the new electrical routes, fitting the large sliding doors, and finding and sealing the points where water was getting in.

Materials and equipment

Five-chamber Gealan frames with triple glazing; Sikafloor coatings on floors and walls.

Result

A complete renovation — an old house brought up to current insulation and design standards.

Roof and exterior

Roof and facade — Codlea

Romania · June 2014 · 13 photographs

Roof and facade — Codlea — 5 Juni 2014
5 Juni 2014
Roof and facade — Codlea — 5 Juni 2014
5 Juni 2014
Roof and facade — Codlea — 5 Juni 2014
5 Juni 2014
Roof and facade — Codlea — 5 Juni 2014
5 Juni 2014
Roof and facade — Codlea — 18 Juni 2014
18 Juni 2014
Roof and facade — Codlea — 18 Juni 2014
18 Juni 2014
Roof and facade — Codlea — 19 Juni 2014
19 Juni 2014
Roof and facade — Codlea — 19 Juni 2014
19 Juni 2014
Roof and facade — Codlea — 20 Juni 2014
20 Juni 2014
Roof and facade — Codlea — 20 Juni 2014
20 Juni 2014
Roof and facade — Codlea — 23 Juni 2014
23 Juni 2014
Roof and facade — Codlea — 23 Juni 2014
23 Juni 2014
Roof and facade — Codlea — 27 Juni 2014
27 Juni 2014

What was done

  • Stripped the old roof and replaced it with a new one
  • Stripped the degraded areas of render and repaired the exterior walls
  • Applied a complete thermal insulation system
  • Repainted the facade with structured decorative render
  • Renewed the window sills and restored the plinth

Materials and equipment

Thermal insulation in 10 cm expanded polystyrene, reinforced with fibreglass mesh and premium filler, finished in structured silicone render. The plinth was restored in impermeable decorative stone.

Result

Excellent thermal insulation and a modern finish built to last.

Complete renovation

Full apartment renovation — Bucharest

Romania · 2013 – 2014 · 14 photographs

Full apartment renovation — Bucharest — 1 Januar 2013
1 Januar 2013
Full apartment renovation — Bucharest — 1 Januar 2013
1 Januar 2013
Full apartment renovation — Bucharest — 1 Januar 2013
1 Januar 2013
Full apartment renovation — Bucharest — 1 Februar 2014
1 Februar 2014
Full apartment renovation — Bucharest — 1 Februar 2014
1 Februar 2014
Full apartment renovation — Bucharest — 1 Februar 2014
1 Februar 2014
Full apartment renovation — Bucharest — 22 Februar 2014
22 Februar 2014
Full apartment renovation — Bucharest — 14 März 2014
14 März 2014
Full apartment renovation — Bucharest — 18 März 2014
18 März 2014
Full apartment renovation — Bucharest — 18 März 2014
18 März 2014
Full apartment renovation — Bucharest — 19 März 2014
19 März 2014
Full apartment renovation — Bucharest — 19 März 2014
19 März 2014
Full apartment renovation — Bucharest — 19 März 2014
19 März 2014
Full apartment renovation — Bucharest — 19 März 2014
19 März 2014

What was done

  • Complete apartment renovation
  • Replaced the sanitary installations
  • Laid new laminated floors
  • New plaster and tiling throughout
  • Fitted the bathroom furniture
  • Renewed the electrical installation alongside the plumbing
  • Handed the apartment over turnkey

The difficult part

Installing the new services in confined spaces, adapting them to modern systems, and straightening walls that were out of true.

Materials and equipment

Ceramic wall and floor tiling, new sanitary ware and pipework, electrical points — all chosen by the client.

Result

A new, modern finish with quality materials, delivered ready to use.

Restoration

Old house restoration — France

France · 2008 – 2014 · 4 photographs

Old house restoration — France — 11 April 2008
11 April 2008
Old house restoration — France — 17 Februar 2014
17 Februar 2014
Old house restoration — France — 13 April 2014
13 April 2014
Old house restoration — France — 14 Mai 2014
14 Mai 2014

What was done

  • Interior and exterior renovation of a very old house
  • Restored the natural stone masonry and the decorative mouldings of the facade
  • Repaired the balconies and made them watertight
  • Electrically heated floors
  • New bathroom furniture

The difficult part

Keeping the old architecture and design: renovating the oven without altering the original structure, preserving the original colours, and installing new heating and floors to match the original design with similar materials.

Materials and equipment

Facade renders in natural hydraulic lime and white cement with weather-resistant paint. Inside, moisture-resistant plasterboard on metal framing with dense mineral wool for sound separation, premium flooring and decorative ceramic tiling.

Result

A house that keeps the architecture and character of an old building while offering modern comfort.

Plastering

Plaster and waterproofing — Austria

Austria · 2012 – 2013 · 6 photographs

Plaster and waterproofing — Austria — 1 Januar 2012
1 Januar 2012
Plaster and waterproofing — Austria — 1 Januar 2012
1 Januar 2012
Plaster and waterproofing — Austria — 28 Juni 2013
28 Juni 2013
Plaster and waterproofing — Austria — 28 Juni 2013
28 Juni 2013
Plaster and waterproofing — Austria — 2 Juli 2013
2 Juli 2013
Plaster and waterproofing — Austria — 2 Juli 2013
2 Juli 2013

What was done

  • New plaster and painting for an old house
  • Stripped the damp and exfoliated render back to sound material
  • Cleaned the substrate with a high-pressure water jet
  • Fitted drip-edge beads at the balconies and windows
  • Waterproofing at the base of the walls

Materials and equipment

A silicatic adhesion primer, filler reinforced with high-strength fibreglass mesh, and a fine structured decorative render.

Result

A facade with dependable protection against weather, hairline cracking and exterior mould.

Structural work

Steel hall — foundations and structure

Romania · 2007 – 2008 · 14 photographs

Steel hall — foundations and structure — 1 Juli 2007
1 Juli 2007
Steel hall — foundations and structure — 1 August 2007
1 August 2007
Steel hall — foundations and structure — 1 August 2007
1 August 2007
Steel hall — foundations and structure — 1 August 2007
1 August 2007
Steel hall — foundations and structure — 1 August 2007
1 August 2007
Steel hall — foundations and structure — 1 August 2007
1 August 2007
Steel hall — foundations and structure — 1 August 2007
1 August 2007
Steel hall — foundations and structure — 1 August 2007
1 August 2007
Steel hall — foundations and structure — 1 August 2007
1 August 2007
Steel hall — foundations and structure — 1 September 2007
1 September 2007
Steel hall — foundations and structure — 1 September 2007
1 September 2007
Steel hall — foundations and structure — 1 September 2007
1 September 2007
Steel hall — foundations and structure — 1 Januar 2008
1 Januar 2008
Steel hall — foundations and structure — 1 Februar 2008
1 Februar 2008

What was done

  • Built the foundations
  • Erected the steel structure for the hall

Materials and equipment

Bolted steel structure.

Timber construction

Exterior garage on a timber frame — Podul Olt

Romania · April – August 2024 · 9 photographs

Exterior garage on a timber frame — Podul Olt — 3 April 2024
3 April 2024
Exterior garage on a timber frame — Podul Olt — 13 August 2024
13 August 2024
Exterior garage on a timber frame — Podul Olt — 13 August 2024
13 August 2024
Exterior garage on a timber frame — Podul Olt — 13 August 2024
13 August 2024
Exterior garage on a timber frame — Podul Olt — 13 August 2024
13 August 2024
Exterior garage on a timber frame — Podul Olt — 13 August 2024
13 August 2024
Exterior garage on a timber frame — Podul Olt — 13 August 2024
13 August 2024
Exterior garage on a timber frame — Podul Olt — 13 August 2024
13 August 2024
Exterior garage on a timber frame — Podul Olt — 13 August 2024
13 August 2024

What was done

  • Built an exterior garage on a timber structure
  • Covered it with sheet metal

Materials and equipment

Timber frame with a sheet-metal covering.

Interior renovation

Interior apartment renovation — Brăila

Romania · 2012 · 3 photographs

Interior apartment renovation — Brăila — 1 November 2012
1 November 2012
Interior apartment renovation — Brăila — 1 November 2012
1 November 2012
Interior apartment renovation — Brăila — 1 November 2012
1 November 2012

What was done

  • Complete interior renovation of the apartment
  • Broke out the concrete in the walls to run the new services
  • Renewed the water and drainage installation
  • Brought the walls back to square
  • Tiled the bathroom and fitted the sanitary ware
  • Repainted the rooms

The difficult part

Breaking out the hard concrete in the walls for the new pipes, then bringing the walls back to square so the bath and the tiles sat correctly.

Result

An apartment brought up to date inside, with new services and finishes.