Formwork for concrete
Formwork is the mould for concrete: props and panels are set to level, checked for tightness, and struck only once the concrete has gained enough strength.
Download the manual (PDF)Popular how-to videos for every stage of a project — foundations, installations and finishes.
No tutorial matches your search.
Formwork is the mould for concrete: props and panels are set to level, checked for tightness, and struck only once the concrete has gained enough strength.
Download the manual (PDF)The slab is the base of every building: the ground is levelled, formwork and reinforcement are placed, and the concrete is poured, compacted and levelled before it cures.
Download the manual (PDF)Walls are built course by course: each brick is bedded in mortar, checked for level and plumb, and the joints are finished while the mortar is still workable.
Download the manual (PDF)A frame carries the building: columns and beams are formed, reinforced and cast in sequence, and the concrete is compacted and cured before the next level is started.
Download the manual (PDF)Steel takes the tension that concrete cannot: bars are cut, bent and tied into a cage with the correct cover, so the reinforcement sits exactly where the engineer designed it.
Download the manual (PDF)Waterproofing closes a flat roof: the membrane is laid over the deck with sealed laps and dressed up at the edges, so standing water cannot find a way through.
Download the manual (PDF)Rainwater is collected at the eaves: the gutter is set with a fall to the outlet, brackets carry the snow load, and the downpipe discharges clear of the wall.
Download the manual (PDF)Metal sheets are laid in overlapping runs and fixed through the crest with sealed screws, so thermal movement is allowed and water cannot get in.
Download the manual (PDF)Shingles are fixed in overlapping rows: a starter course seals the edge, and each row is nailed and staggered so rainwater runs off without leaking.
Download the manual (PDF)Insulation keeps the heat in: the layers are fitted tight between and over the joists without gaps, and a vapour barrier stops moisture reaching the cold side.
Download the manual (PDF)Tiles are laid in courses over battens and underlay, each course overlapping the one below with the correct headlap so rain is shed clear of the deck.
Download the manual (PDF)The roof frame carries the covering: trusses or rafters are set out, braced and fixed so the structure stays square and takes wind and snow loads.
Download the manual (PDF)A split unit has an indoor and an outdoor part: the bracket is fixed level, the pipe run is insulated and drained, and the circuit is vacuumed before it is charged.
Download the manual (PDF)A boiler is fixed to the wall, connected to gas, water and the heating circuit, and then flushed and commissioned so it runs safely at the right pressure.
Download the manual (PDF)A switch controls the live conductor: the circuit is isolated, the conductors are connected to the correct terminals, and the earth is kept continuous.
Download the manual (PDF)A rewire replaces every circuit: the routes are planned, cables are pulled in one run, the board is rebuilt with modern protection, and each circuit is tested and certified.
Download the manual (PDF)The board is the heart of the installation: each circuit is protected by its own breaker, RCDs protect people, and every conductor is labelled and tested before the supply is switched on.
Download the manual (PDF)A radiator is part of a closed heating circuit: the water is drained, the valves are shut, and the radiator is removed and refitted without trapping air in the system.
Download the manual (PDF)A heat pump moves heat rather than burning fuel: the outdoor unit sits on a level base, the pipework is insulated, and the system is balanced to low flow temperatures.
Download the manual (PDF)Copper pipes are joined by soldering: the joint is cleaned, flux is applied, the fitting is heated, and the solder is drawn into the gap to make a watertight seal.
Download the manual (PDF)Panels are fixed to rails on the roof with sealed mounts, wired in strings to an inverter, and the whole array is earthed and monitored.
Download the manual (PDF)A battery is sized on the energy used between charges, not on the peak load: capacity, depth of discharge and cycle life decide how much useful storage the system really has.
Download the manual (PDF)The mounting system is the foundation of the array: rails are fixed to the roof structure with sealed brackets, levelled, and the panel clamps are spaced to hold the modules against wind uplift.
Download the manual (PDF)A complete system ties the parts together: panels are wired in strings to the inverter, the battery is connected through its protection, and the whole installation is earthed, labelled and tested.
Download the manual (PDF)Heating pipes are laid on the insulated slab in a set pattern, connected to a manifold, and the floor is screeded over before the system is commissioned.
Download the manual (PDF)A well reaches the water table: the hole is driven or drilled to depth, the casing keeps it open, and the pump and pipework are set with a sealed head so surface water cannot enter.
Download the manual (PDF)A suspended ceiling hides the services: the grid is levelled from a datum, hangers are fixed at set centres, and the tiles drop into the frame.
Download the manual (PDF)Plasterboard gives a fast, flat wall: sheets are screwed to a set-out frame, the joints are taped and filled, and the surface is sanded ready to paint.
Download the manual (PDF)Laminate planks lock together over an underlay: a small gap is left at the walls so the floor can move, and the last row is cut to fit.
Download the manual (PDF)A room is painted top to bottom: the edges are cut in first, then the roller applies an even coat, and a second coat gives a clean, durable finish.
Download the manual (PDF)Parquet goes on a flat, dry subfloor: the pattern is set out from the centre of the room, the boards are glued or clicked together, and the floor is sanded and finished.
Download the manual (PDF)Plaster gives walls a smooth, flat surface: it is mixed, spread in thin coats with a trowel, and flattened with a straight edge before it sets.
Download the manual (PDF)Render protects the wall: the background is prepared and dampened, the mortar is thrown on and ruled off, and the surface is floated before it sets.
Download the manual (PDF)A screed gives the floor its level: the mix is spread, compacted and ruled to level rails, and left to cure before any covering is laid.
Download the manual (PDF)Tiles are laid on a level bed of adhesive: spacers keep the joints even, and each tile is checked so it sits flat and in line with the rest.
Download the manual (PDF)Vinyl planks float over a level, clean subfloor: rows are staggered, a small expansion gap is left at the walls, and the edges are trimmed and finished.
Download the manual (PDF)Walls are prepared and sized first: the paste is applied, the drop is hung plumb from the ceiling, and the joints are smoothed so they butt tightly.
Download the manual (PDF)Wall tiles are set on a flat, primed background: adhesive is combed on, tiles are pressed and spaced, and the joints are grouted once the adhesive has cured.
Download the manual (PDF)Cellar shelves are built on a treated frame: uprights are fixed to the damp-proof wall, the bearers are levelled and the boards are fixed so air can move behind them.
Download the manual (PDF)A deck starts with a treated frame on posts: boards are laid with an even gap, fixed with stainless or hidden screws, and the edges are trimmed.
Download the manual (PDF)The lining is set plumb and square, the door is hung with even gaps, and the handle, latch and architraves are fitted once it swings freely.
Download the manual (PDF)Units are set out from the services: the base run is levelled and fixed to the wall, the worktop is cut and joined, and doors and appliances are adjusted last.
Download the manual (PDF)Slabs go on a compacted sub-base and a bedding layer: each one is tapped to level, the joints are filled, and the surface is checked for fall.
Download the manual (PDF)A pool is set on a level, drained base: the ground is compacted and levelled, the frame or shell is assembled, the liner is fitted, and the pump, filter and skimmer are connected and filled.
Download the manual (PDF)The pan is set on a level flange, the soil connection is sealed, the cistern is filled and set, and the pan is bedded and screwed down.
Download the manual (PDF)The vanity is levelled and fixed to the wall, the waste and tap connections are made watertight, and the basin is sealed to the top.
Download the manual (PDF)The frame is packed level in the opening, fixed through the brackets, sealed to the reveal, and the glass and trims are fitted last.
Download the manual (PDF)Leaks are found by elimination: the supply is isolated and the meter watched, then each run is pressure-tested and traced with acoustic or thermal tools until the wet spot is located.
Download the manual (PDF)Repair starts after the source is stopped: the wet plaster and board are cut back to sound material, the wall is dried, and the surface is rebuilt and finished to match.
Download the manual (PDF)Mould shows itself by smell, stains and symptoms: a musty odour, dark patches in corners and repeated colds point to damp, and a moisture meter confirms it behind the surface.
Download the manual (PDF)Mould is removed by killing it, not painting over it: the cause of the damp is fixed first, the surface is treated with a fungicide, wiped clean and then repainted with a mould-resistant paint.
Download the manual (PDF)